A major overhaul of the Azerbaijan Caspian Shipping Company (ACSC) towing and supply vessel Andoga has been completed.
Part of ACSC's Caspian Sea oil fleet, the 67.5-metre by 13.8-metre Andoga had two new diesel engines installed, lighting system updated and repairs made to main and reserve pumps, pipeline systems, power plants, control equipment and the steering and auxiliary steering device.
Damaged parts of the hull and a wooden deck cover were replaced, and renovations carried out in the living quarters, bathrooms and dining room.
Andoga passed the sea trials.