Inland Tug Operations

Third Project POSS115 tug christened and launched at Nibulon Shipyard

Baird Maritime

The third Project POSS115 tug was christened and launched into the water for the first time at Ukraine's Nibulon Shipbuilding and Repair Yard on Monday, January 28.

Nibulon-10 will provide towage for non-self-propelled vessels through the Dnieper River upon entering service.

The vessel has a length of 37.2 metres, a draught of 2.54 metres, and a speed of 11 knots.