On June 19, Samsung Heavy Industries laid the keel for a newbuild LNG carrier for GasLog..The ship will hold a capacity of 180,000 cubic metres with a 0.07 per cent boil off rate and re-liquefaction..Delivery of the ship is scheduled for July 2019.
On June 19, Samsung Heavy Industries laid the keel for a newbuild LNG carrier for GasLog..The ship will hold a capacity of 180,000 cubic metres with a 0.07 per cent boil off rate and re-liquefaction..Delivery of the ship is scheduled for July 2019.