Shipping

Okskaya Sudoverf launches third barge of Project ROB20

Baird Maritime

A launching ceremony for the third vessel of a series of Project ROB20 non-self-propelled barges was held June 7, 2018 at Okskaya Sudoverf Shipyard.

The ship, named Belmax 3 is being built under order of PAO STLC.

The contract for construction was signed on October 31, 2017. The first barge was laid down on November 22, 2017.

The ship has an LOA of 118.79 metres, deadweight of 6,013 tonnes and maximum cargo tank capacity of 6,860m3.