Netherlands-based Jumbo has completed the pre-installation and tensioning of a shallow water catenary anchor leg mooring (CALM) buoy mooring system at a depth of 26 metres for the Mersa El-Hamra terminal offshore Egypt.
The scope included the pre-lay of 10 Stevshark drag anchors and six chain moorings and the subsequent tensioning of the mooring legs up to 512 tonnes for client WEPCO/Micoperi.
Jumbo had utilised the heavy load carrier vessel Fairplayer for the project.