Banner

Banner
Banner
Banner

Baird Maritime News Alerts

Magazine Archive

FREE online issues of Baird Magazines (delayed two months):

Baird Maritime Magazine

Work Boat World

Ships and Shipping

Ausmarine

Weekly Poll

Is third-party seafood labelling good for the fishing industry?
 
‘Jun Yang 1’ en route to Guangzhou
Thursday, 01 September 2016 14:45

The Trailing Suction Hopper Dredger (TSHD) ‘Jun Yang 1’ is currently on her maiden voyage from Kinderdijk, The Netherlands to Guangzhou, China.

The ‘Jun Yang 1’, built by Royal IHC for the Guangzhou Dredging Company (GDC), measures 167.5 by 31.0 metres.

The delivery voyage itself is being conducted by Redwise with a key crew of five, together with 22 crewmembers of GDC, including all officers and engineers, using the delivery voyage for familiarisation purposes.

The vessel is propelled by two MAN type 9L48/60CR main engines, with a total of 21,600kW, attaining a maximum speed of more than 16 knots.

Cialis Side Effects is just like any other medication but do not necessity to worry and think that everyone is bad. There is nothing surprising in this. Everybody is simple and clear.