Banner

Banner
Banner

Baird Maritime News Alerts

Banner

Magazine Archive

FREE online issues of Baird Magazines (delayed two months):

Baird Maritime Magazine

Work Boat World

Ships and Shipping

Ausmarine

Weekly Poll

Is third-party seafood labelling good for the fishing industry?
 
Vard to build three module carrier vessels for Kazmortransflot
Tuesday, 23 August 2016 16:47

Vard has confirmed a three-vessel contract with Kazmortransflot (KMTF).

The contract includes the design and construction of three module carrier vessels of VARD 9 28 design for KMTF.

The contract win was previously disclosed on July 29, 2016 but until now the recipient and any further details about the vessels had not been disclosed.

The vessels will be operated by KMTF through a consortium led by Blue Water Shipping.

The trio, measuring 113 by 22 metres, are designed for transport in the Caspian Sea.

All three vessels will be built at Vard Braila in Romania. Delivery is scheduled between the end of 2017 and the start of 2018. The contract is reportedly worth US$70 million.

Cialis Side Effects is just like any other medication but do not necessity to worry and believe that all is bad. There is nothing surprising in this. Everyone is simple and clear.